The overall design height of the machine is 60 meters, equipped with hot-dip galvanized standard sections and attachment frames, fully ensuring the structural strength and anti-corrosion performance of the entire machine in complex outdoor conditions, and

Oct 15, 2026

DAHAN SCE900G 9000KG Construction Hoist

With the vigorous development of large-scale industrial complexes and super-large infrastructure projects worldwide, traditional construction elevators have limited load capacity and narrow cage space, restricting the single transportation of large components and heavy equipment, and requiring repeated transportation and multiple hoisting operations. This not only slows down the project schedule but also increases the safety risks of on-site operations, becoming a long-standing industry pain point for extremely large-scale engineering construction. In response to the real-world conditions of the global market, the R&D team of Dahan Technology, based on decades of experience in lifting equipment technology, has broken through multiple technical barriers such as structural design, power matching, and safety protection, successfully developing the SCE900G super-large cage super-large load construction elevator, achieving an ultra-large transportation capacity of 9,000 kg, a 9.0×6.0×5.0M ultra-large customized cage space, completely solving the vertical transportation problems of large-weight and large-volume materials, and filling the technical gap in the global field of super-large-load and super-large-volume special construction elevators.


The overall design height of the machine is 60 meters, equipped with hot-dip galvanized standard sections and attachment frames, fully ensuring the structural strength and anti-corrosion performance of the entire machine in complex outdoor conditions, and suitable for the harsh usage environment of maritime transportation and overseas construction sites. The super-large internal space can fully accommodate large steel structures, heavy mechanical equipment, and bulk building materials, without the need to disassemble components, enabling a single vertical transfer of large materials, fundamentally reducing the losses and safety hazards caused by component disassembly and secondary transportation, and significantly improving the overall vertical transportation efficiency of the project.


In terms of the power system, the SCE900G is equipped with a high-performance inverter and a high-power motor, balancing the running speed and stability under heavy-load conditions. Even in the extreme load condition of 9 tons, the entire machine still runs smoothly, with small start-up and stop impacts, effectively reducing the fatigue loss of structural components. The equipment is equipped with a professional anti-fall safety device, forming the core safety defense line of the entire machine; combined with the floor operation panel, bottom call system, and cable drum guide device, the human-computer interaction logic is complete, and the floor call and leveling operation are convenient and efficient, balancing heavy-load performance and human-machine usability. The entire machine adopts a universal industrial voltage, suitable for the vast majority of overseas construction site power supply conditions, completing customized development in all dimensions of structure, power, safety, and electrical, and creating an efficient vertical transportation solution tailored for overseas large-scale engineering projects.


ONLINE MESSAGE

CONTACT US

Stay Informed With Our Newsletter